綜采支架快速解體法
綜采支架快速解體法
摘 要:副井提升能力不足的礦井利用閑置的液壓支架作為動(dòng)力,充分發(fā)揮地面工廠的裝備優(yōu)勢(shì),把整體液壓支架拆分成兩個(gè)分體,保證支架安全入井,滿足了綜采工作面安裝的需要。具有減少人員、拆卸高效、保障安裝工期等特點(diǎn)。
Abstract: The auxiliary shaft enhance the lack of mine hydraulic support idle as the driving force, give full play to the advantages of ground plant and equipment, the overall hydraulic support split into two split to ensure that the stent safety into the well, to meet the need for installation of mechanized mining face. It has to reduce staff, efficient demolition, to protect the installation duration and other characteristics.Key words: bracket; fast; demolition
關(guān)鍵詞:支架;快速;拆卸
中圖分類號(hào) :S605+.2文獻(xiàn)標(biāo)識(shí)碼: A 文章編號(hào):
1礦井概況
平寶公司首山一礦設(shè)計(jì)生產(chǎn)能力240萬噸/年,服務(wù)年限92年。礦井采用立井石門開拓,工業(yè)廣場(chǎng)布置主、副井井筒,工業(yè)廣場(chǎng)南1500m布置中央回風(fēng)井。分-600m和-760m兩個(gè)水平開拓,初期投產(chǎn)白石山背斜南翼己二采區(qū)。
2009年7月礦井首采面己15-12010開始試生產(chǎn),2011年8月接替工作面己15-12030投產(chǎn),10月份第二個(gè)綜采工作面己16.17-12041計(jì)劃投產(chǎn),礦井形成兩個(gè)綜采工作面同時(shí)生產(chǎn)的格局。
2礦井工作面設(shè)計(jì)簡(jiǎn)介
首采工作面己15-12010走向長(zhǎng)度1080m,采長(zhǎng)210m,可采儲(chǔ)量108萬噸。工作面采用ZY6400/20/40型掩護(hù)式液壓支架135組,初撐力5064KN,支架中心距1500mm,工作阻力6400KN,泵站壓力31.5Mpa,支架高度2000~4000mm,重量為20.065t。
接替工作面己15-12030走向長(zhǎng)度1310m,采長(zhǎng)180m,可采儲(chǔ)量102.8萬噸。工作面采用ZY6400/20/40型掩護(hù)式液壓支架119組,其它與首采面相同。
第二個(gè)工作面己16.17-12041走向長(zhǎng)度1597m,采長(zhǎng)160m,可采儲(chǔ)量116.4萬噸。工作面采用ZY6400/23.5/45D型掩護(hù)式液壓支架108組,初撐力5050KN,