2009版公路工程施工定額

Fixed Highway Construction 2009 Edition

新版《公路工程施工定額》是原交通部2007年公布的《公路工程預(yù)算定額》(JTG/T B 06-01-2007 )勞動(dòng)、機(jī)械定額水平確定的基礎(chǔ)依據(jù),是在原交通部1997年公布的《公路工程施工定額》的基礎(chǔ)上,通過調(diào)查研究及綜合分析各省、自治區(qū)、直轄市交通廳(局、委員會)及部分大型公路施工企業(yè)提供公路工程施工定額資料,并參照其他有關(guān)部門的勞動(dòng)定額,由權(quán)威機(jī)構(gòu)——交通公路工程定額站組織編制的,作為全國公路建設(shè)領(lǐng)域通用的施工定額標(biāo)準(zhǔn)。

    新版《公路工程施工定額》以交通運(yùn)輸部2007年以前頒布的各項(xiàng)施工及驗(yàn)收技術(shù)規(guī)范、安全操作規(guī)程及其他有關(guān)規(guī)定為依據(jù)編制,其工程質(zhì)量要求均按國家或地方制定的施工及驗(yàn)收技術(shù)規(guī)范、工程質(zhì)量檢驗(yàn)評定標(biāo)準(zhǔn)、技術(shù)規(guī)程中有關(guān)質(zhì)量要求和質(zhì)量標(biāo)準(zhǔn)執(zhí)行。
同時(shí)根據(jù)公路工程的特點(diǎn),本定額除列有勞動(dòng)定額外,還列有機(jī)械定額,有的項(xiàng)目還同時(shí)列出勞動(dòng)定額和機(jī)械定額。
本定額中所列機(jī)械的臺班定額,均不包括在《公路工程機(jī)械臺班費(fèi)用定額》中規(guī)定配備的操作機(jī)械工人的勞動(dòng)定額。

新版《公路工程施工定額》將于2009年7月1日起實(shí)施,并授權(quán)人民交通獨(dú)家發(fā)行
第一章準(zhǔn)備工作說明人工伐樹、挖根1-2推土機(jī)推挖樹根
1-3人工砍、挖灌木林
1-4人工割草、挖草皮、挖竹根
1-5推土機(jī)推除草皮、清除表土

第二章路基工程說明
2-1人工挖陡坡土方
2-2人工挖運(yùn)土方
2-3人工夯實(shí)填土
2-4人工挖運(yùn)凍土、濕土、淤泥
2-5推土機(jī)推挖土方

第三章路面工程
說明
修整舊中級路面
3-2全部挖除舊路面
3-3挖路槽、培路肩、挖筑泄水槽
3-4人工鋪料
3-5平地機(jī)鋪料

第四章
隧道工程
說明
4-1
人工開挖
4-2機(jī)械開挖配手推車或斗車運(yùn)輸
4-3機(jī)械開挖配自卸汽車運(yùn)輸
4-4開挖堅(jiān)石半隧道
4-5裝巖機(jī)裝渣及出渣遠(yuǎn).運(yùn)裝巖機(jī)裝渣及出渣遠(yuǎn)運(yùn)
New version of "Highway Construction scale" is a former Ministry of Communications published in 2007, "highway project budget fixed" (JTG / TB 06-01-2007) labor, machinery based on a fixed basis set level, the former Ministry of Transportation in 1997 released " Highway Construction scale "basis, through the investigation and comprehensive analysis of various provinces, autonomous regions and municipalities directly under Communications Department (Bureau of the Committee) and some major road construction companies to provide information on highway construction scale, and with reference to other relevant departments of labor quota, the authority - Transportation Highway Engineering Dinge Zhan organization and structure, and as the common areas of the national highway construction of a fixed standard.
    New version of "Highway Construction fixed" to the Ministry of Transport issued before 2007, the construction and acceptance of technical specifications, safety operation procedures and other relevant provisions of the preparation based on its engineering quality requirements according to national or local development of construction and acceptance of technology specification, quality inspection and assessment standards, technical regulations relating to the implementation of quality requirements and quality standards. At the same time the characteristics of the road project, in addition to including the fixed working scale, but also contains mechanical scale, the project has also listed some of the quotas and fixed machinery. The scale listed in the class mechanical platform scale, are not included in the "cost of road works Jixietaiban fixed" in the operation of machinery with the provisions of workers labor quotas.
New version of "Highway Construction scale" will be July 1, 2009 come into operation, and authorized the Transportation Research published the first chapter exclusive to prepare job descriptions for manual cutting of trees, digging roots 1-2 bulldozers digging the roots
1-3 manual cutting, digging shrubs
1-4 man mowing, digging turf, digging bamboo root
1-5 bulldozed addition to turf, topsoil removal
Chapter Subgrade Description
2-1 man-dug earth slopes
2-2 earthwork operation manual digging
Artificial compacted fill 2-3
2-4 Win artificial digging soil, wet soil, sludge
2-5 bulldozed earth digging
Chapter III road project
Explain
Old Intermediate pavement repair
3-2 All the old road excavation
3-3 road-tank, training shoulder, digging tank vent
Shop manual feed 3-4
3-5 graders shop materials
Chapter IV
Tunnel
Explain
4-1
Excavated
4-2 mechanical excavation with cart or dump trucks transport
4-3 mechanical excavation with dump truck transport
4-4 semi-hard rock tunnel excavation
4-5 rock loader mounted residue and the residue away. Transport rock loader mounted residue and the residue transported far
 


  2009版公路工程施工定額 下載地址
進(jìn)入下載地址列表

猜你還喜歡

建筑工程: 施工組織設(shè)計(jì) 圖紙 論文 方案 安全資料 工藝 建筑軟件 節(jié)能 專業(yè)資料 合同 交底 文本 建筑考試 教程
園林景觀: 園林施工方案 園林論文 園林考試 園林表格 景觀專業(yè)資料 園林圖紙 景觀設(shè)計(jì)
暖通空調(diào): 暖通專業(yè)資料 暖通軟件 技術(shù)交底 暖通論文 暖通考試 暖通圖紙 暖通施工方案 暖通軟件
水利工程: 水利施工方案 水利考試 水利專業(yè)資料 水利軟件 水利論文
結(jié)構(gòu)工程: 結(jié)構(gòu)施組方案 結(jié)構(gòu)圖紙 結(jié)構(gòu)軟件 結(jié)構(gòu)課件 工藝工法 結(jié)構(gòu)考試 結(jié)構(gòu)專業(yè)資料 結(jié)構(gòu)論文 其他資料
電氣工程: 電氣施工方案 電氣圖紙 電氣軟件 電氣論文 電氣課件 智能建筑 電氣專業(yè)資料 電氣考試
建筑給排: 給排施組方案 技術(shù)交底 給排水專業(yè)資料 污水處理 消防工程 給排水圖紙 給排水論文 給排水軟件
安裝工程: 設(shè)備安裝圖紙 安裝工程專業(yè)資料 安裝施組設(shè)計(jì) 專題
工程造價(jià): 造價(jià)法規(guī) 造價(jià)視頻 造價(jià)指標(biāo) 建筑造價(jià) 造價(jià)考試 水利造價(jià) 電力造價(jià) 裝修造價(jià) 其他 安裝造價(jià) 路橋造價(jià) 市政造價(jià) 園林造價(jià) 造價(jià)軟件 造價(jià)表格 清單實(shí)
工程監(jiān)理: 監(jiān)理交底 施工監(jiān)理 監(jiān)理文檔 旁站監(jiān)理 監(jiān)理考試 合同表格 監(jiān)理細(xì)則 監(jiān)理大綱 監(jiān)理總結(jié) 監(jiān)理月報(bào) 監(jiān)理規(guī)劃
路橋工程: 合同表格 路橋工藝 路橋論文 路橋交底 安全資料 路橋標(biāo)書 路橋?qū)I(yè)資料 路橋軟件 其他資料 路橋圖紙 路橋施工方案 路橋考試
裝飾裝修: 裝修施工方案 裝修圖紙 室內(nèi)設(shè)計(jì) 施工工藝 裝修技術(shù)交底 裝修表格 裝修資料 建筑文庫