顧橋礦綜采工作面快速安裝技術(shù)
顧橋礦綜采工作面快速安裝技術(shù)
摘要: 近年來(lái)顧橋礦產(chǎn)量不斷增加, 綜采隊(duì)搬家倒面頻繁, 安裝工作量大, 質(zhì)量要求高。為確保綜采工作面正常接替, 實(shí)現(xiàn)礦井高產(chǎn)穩(wěn)產(chǎn), 工程技術(shù)人員經(jīng)過(guò)不斷實(shí)踐和研究, 總結(jié)出一套綜采工作面安全、快速、高質(zhì)量安裝的管理方法, 實(shí)現(xiàn)了綜采工作面的快速安裝, 提高了礦井的產(chǎn)量與效益。
關(guān)鍵詞: 綜采工作面; 快速安裝; 綜采機(jī)械化; 支架
Abstract: in recent years, increasing production of guqiao coal mine, ZongCaiDui move down face frequent, installation workload is big, high quality requirements. In order to ensure the normal fully mechanized working face to succeed, realize high and stable mine, engineering and technical personnel after continuous practice and research, summarized a set of fully mechanized working face security, fast, and high quality installation management method, realize the fully mechanized working face fast installation, improve the production of mine and benefits.
Keywords: fully mechanized working face; Fast installation; Compound mining mechanization; stents
顧橋礦是亞洲井工開(kāi)采規(guī)模最大的礦井,2008年礦井生產(chǎn)原煤產(chǎn)量突破千萬(wàn)噸大關(guān), 自2009年以來(lái)礦井原煤產(chǎn)量保持在1200萬(wàn)噸。隨著礦井綜采機(jī)械化水平的提高,綜采隊(duì)搬家倒面頻繁,綜采面安全快速高質(zhì)量的安裝,不僅是實(shí)現(xiàn)綜采面正常接替的重要保證,,同時(shí)也是礦井實(shí)現(xiàn)高產(chǎn)、穩(wěn)產(chǎn)的重要條件。綜采設(shè)備體積大、質(zhì)量重, 解體、入井、運(yùn)輸、組裝都不方便。為實(shí)現(xiàn)快速安裝,在綜采工作面系統(tǒng)形成以后,應(yīng)根據(jù)實(shí)際條件盡量選擇運(yùn)輸線路較短、絞車數(shù)量較少且比較暢通的運(yùn)輸路線,為實(shí)現(xiàn)快速安裝創(chuàng)造有利條件,F(xiàn)將顧橋礦在快速安裝方面形成的一套較為成熟和完善的管理模式作一介紹。
1、 從設(shè)計(jì)源頭抓起,優(yōu)化巷道設(shè)計(jì),掘進(jìn)過(guò)程中嚴(yán)格按設(shè)計(jì)圖紙施工,確保巷道一次成型滿足綜采設(shè)備安裝需要,這將為工作面快速安裝提供先決條件。
1.1 綜采工作面軌運(yùn)順車場(chǎng)及順槽巷道設(shè)計(jì)斷面要足夠大(當(dāng)頂板完整時(shí),優(yōu)先采用錨梁網(wǎng)支護(hù),巷道斷面為矩形斷面:5000×3400mm,當(dāng)頂板破碎易掉(過(guò)斷層構(gòu)造)時(shí),則采用架29U棚支護(hù),斷面規(guī)格:5200×4200mm),車場(chǎng)要足夠長(zhǎng)(至少40m),巷道轉(zhuǎn)彎處彎曲半徑要足夠大(至少15m),巷道成型好,一次性滿足液壓支架存放、運(yùn)輸、打運(yùn)的需要,從而避免工作面安裝時(shí)因巷道限制而再次刷幫、挑頂、臥底或刷擴(kuò)等巷修工作。