靜壓樁施工工藝及管理措施分析
靜壓樁施工工藝及管理措施分析
摘要:近年來(lái),靜壓樁施工技術(shù)逐漸成為熱門(mén)話題。本文介紹了靜壓樁的沉樁機(jī)理和優(yōu)勢(shì),分析了其施工工藝,并結(jié)合作者多年的施工經(jīng)驗(yàn),總結(jié)出靜壓樁施工過(guò)程中對(duì)安全和質(zhì)量方面的控制措施,以供業(yè)內(nèi)人士參考。
關(guān)鍵詞:靜壓樁, 沉樁機(jī)理, 安全管理,擠土效應(yīng)
Abstract: in recent years, the static pile construction technique has become a hot topic. This paper introduces the static pile pile driving mechanism and advantages, and analyzes the construction technology, and combining author’s construction experience, summarizes static pile construction process to the safety and quality control measures, for industry insiders reference.
Keywords: static pile, pile driving mechanism, security management, compaction effect
中圖分類號(hào):TU71文獻(xiàn)標(biāo)識(shí)碼:A 文章編號(hào):
1 概述
1.1 靜壓樁含義及優(yōu)勢(shì)
靜壓樁施工方法是通過(guò)靜力壓樁機(jī)的壓樁機(jī)構(gòu)以壓樁機(jī)自重和機(jī)架上的配重提供反力而將樁壓入土中的沉樁工藝。它具有低噪聲、無(wú)振動(dòng)、無(wú)污染,可以24小時(shí)連續(xù)施工的作業(yè)優(yōu)勢(shì);同時(shí)在實(shí)際施工中由于壓樁引起的應(yīng)力較小,且樁身在施工過(guò)程中不會(huì)出現(xiàn)拉應(yīng)力,樁頭—般都完好無(wú)損,復(fù)壓較為容易。由于靜壓樁的這些優(yōu)點(diǎn)可以縮短建設(shè)工期,創(chuàng)造時(shí)間效益,從而降低工程造價(jià),所以使得靜壓樁施工技術(shù)得到了迅猛發(fā)展及推廣應(yīng)用。
1.2 靜壓樁沉樁機(jī)理
沉樁施工時(shí),樁尖刺入土體中時(shí)原狀土的初應(yīng)力狀態(tài)受到破壞,造成樁尖下土體的壓縮變形,土體對(duì)樁尖產(chǎn)生相應(yīng)阻力,隨著樁貫入壓力的增大,當(dāng)樁尖處土體所受應(yīng)力超過(guò)其抗剪強(qiáng)度時(shí),土體發(fā)生急劇變形而達(dá)到極限破壞,土體產(chǎn)生塑性流動(dòng)(粘性土)或擠密側(cè)移和下拖(砂土),在地表處,粘性土體會(huì)向上隆起,砂性土則會(huì)被拖帶下沉。由于較大的輻射向壓力的作用也使鄰近樁周處土體受到較大擾動(dòng)影響,此時(shí),樁身必然會(huì)受到土體的強(qiáng)大法向抗力所引起的樁周摩阻力和樁尖阻力的抵抗,當(dāng)樁頂?shù)撵o壓力大于沉樁時(shí)的這些抵抗阻力,樁將繼續(xù)