鉆孔混凝土灌注樁施工工藝
鉆孔混凝土灌注樁施工工藝
【摘要】為了保證鉆孔灌注樁成孔和成樁質(zhì)量,提出了防止孔壁坍塌的泥漿制作要求,常見鉆機(jī)鉆進(jìn)問題及解決方法,鋼筋籠制作、水下混凝土澆灌導(dǎo)管安裝和成樁質(zhì)量控制要點(diǎn),試樁試驗(yàn)等,總結(jié)了一套較完整的反循環(huán)鉆機(jī)泥漿護(hù)壁成孔灌注樁的施工工藝和施工方法。
關(guān)健詞:鉆孔灌注樁 泥漿制作反循環(huán)鉆機(jī)成孔 鋼筋籠的制作 水下澆灌砼
【 abstract 】 in order to ensure that bored piles into the holes and the quality of pile, put forward to prevent the mud hole wall collapsed requirements of making, common rig drilling problems and solutions, make underwater concrete reinforcing cage, water catheter installation and the quality of pile control points, test pile test, summarized a set of relatively complete reverse circulation drilling holes into piles slurry supporting the construction process and construction method.
Key words: bored piles mud make reverse circulation drilling holes into the production of steel cage tremie concrete
1.工程概況
楊凌化建家園1#高層商住樓總建筑面積34794.1㎡,總建筑高度97.3米,其中地下室建筑面積為2245㎡,http:///
一、四單元為32層,二、三單元為11層。2#高層住宅樓建筑總面積13524.6㎡、建筑層數(shù)為地上32層、建筑高度為97.45米,地上32層。地下一層均為設(shè)備房及人防工程,裙房?jī)蓪訛樯虡I(yè)用房,三層以上為住宅,結(jié)構(gòu)形式為框剪結(jié)構(gòu),建筑設(shè)計(jì)年限為50年、抗震設(shè)防列度為7度。
本工程主體結(jié)構(gòu)形式為現(xiàn)澆鋼筋砼剪力墻結(jié)構(gòu),高層地基處理采用素土擠密樁樁長(zhǎng)為6m,鋼筋混凝土鉆孔灌注樁樁徑為800mm,樁長(zhǎng)為25m,單樁豎向承載力大于3700KN,其中試樁9個(gè),設(shè)計(jì)水下混凝土強(qiáng)度C40,錨樁36個(gè),設(shè)計(jì)混凝土強(qiáng)度C30,工程樁219個(gè),設(shè)計(jì)混凝土強(qiáng)度C30,基礎(chǔ)采用1400mm厚筏板基礎(chǔ)。1#高層共采用176根混凝土灌注樁;2#高層共采用88根混凝土灌注樁,
近年來城市高層建筑增多,由于地基沒有處理好而起的基礎(chǔ)下沉現(xiàn)象相當(dāng)多,鋼筋混凝土灌注樁是靠樁頭和樁身共同承擔(dān)荷載的一種基礎(chǔ),樁基承載力強(qiáng),所以灌注樁基礎(chǔ)越來越受建設(shè)單位和施工單位的青睞。我們這兩棟高層商住樓也采用混凝土灌注樁基礎(chǔ),根據(jù)《地質(zhì)勘察報(bào)告》表明,我們使用反循環(huán)鉆機(jī)泥漿護(hù)壁成孔施工。在混凝土灌注樁施工過程中認(rèn)真把握每個(gè)環(huán)節(jié),通過施工實(shí)踐,有出現(xiàn)任何技術(shù)和質(zhì)量問題,現(xiàn)以反循環(huán)鉆機(jī)成孔泥漿護(hù)壁,水下灌注砼樁總結(jié)了一套較完整的施工方法。