摘要:建設(shè)工程變更簽證不僅是建設(shè)工程造價管理的重要組成部分,在工程建設(shè)過程中是不可避免的情況,是影響工程投資的關(guān)鍵因素之一。為了發(fā)揮建設(shè)單位工程造價控制的主動性,減少損失,筆者結(jié)合工作實踐,在闡述了工程變更的影響下,就工程變更簽證中存在的問題及原因展開分析,并提出了相應(yīng)的對策和措施。
關(guān)鍵詞:建設(shè)工程;變更簽證;造價;設(shè)計變更;現(xiàn)場簽證;審核
Abstract: construction engineering change visa is not only the construction project cost management is the important constituent, in the engineering construction process is inevitable, affected the project investment is one of the key factors. In order to bring into full play the construction unit of engineering cost control initiative, reduce loss, the author combining the working practice, this paper under the influence of engineering change, engineering change visa problems and reasons existed on analysis, and put forward the corresponding countermeasures and measures.
Keywords: construction project; Change visa; Cost; Design change; The visa; audit
隨著工程建設(shè)規(guī)模的大型化、建設(shè)環(huán)境的復(fù)雜化,建設(shè)工程一般具有材料種類多,建設(shè)周期長的特點,工程變更對于一般的建設(shè)項目,尤其是對工期長的大型和特大型建設(shè)項目來說幾乎是無法避免的。同時,工程變更對工程項目的影響是實實在在的,是造成工程造價變化的主要根源之一,隨意的和無序的變更將極大地影響工程質(zhì)量和進度,并且導(dǎo)致項目成本增加。通過多年與施工方、監(jiān)理方、設(shè)計方代表等的多方工作實踐,發(fā)現(xiàn)充分重視、加強施工管理過程中的工程變更簽證管理,是提高業(yè)主投資效益,有效地控制整個項目的工程造價的一條重要途徑。
1 建設(shè)工程變更簽證存在的問題
1.1 業(yè)主方簽署工程變更簽證的人員對工程造價工作不夠熟練
工程變更簽證對施工合同價格的調(diào)整由造價人員最終在竣工結(jié)算中體現(xiàn),而負責(zé)具體工程變更簽證事宜的要么是業(yè)主方現(xiàn)場管理班子人員,要么是受其委托的監(jiān)理單位人員,而業(yè)主簽署工程變更簽證的人員往往是因為其工作專業(yè)性的原因,對工程造價工作未能深入理解和熟練。