橋梁深水基礎(chǔ)施工技術(shù)
橋梁深水基礎(chǔ)施工技術(shù)
【摘要】橋梁深水基礎(chǔ)施工難度高,危險(xiǎn)性大,近年來一直被人們所重視,施工中只能按照深水樁施工的工藝要求進(jìn)行施工。本文介紹了橋梁深水基礎(chǔ)施工關(guān)鍵技術(shù),進(jìn)行了橋梁深水基礎(chǔ)施工實(shí)證分析。
【關(guān)鍵詞】橋梁深水基礎(chǔ)施工實(shí)證分析
Abstract: The deep-water bridge foundation constructiondifficult, dangerous, in recent years has been valued by the people, the construction can only be constructed inaccordance with the process requirements of theconstruction of deep water pile. This article describes thekey technology for deep water as a bridge foundation construction, bridge deep foundation construction empiricalanalysis.Keywords: bridge deep foundation construction empirical analysis
中圖分類號(hào):K928.78文獻(xiàn)標(biāo)識(shí)碼:A 文章編號(hào):
橋梁深水樁基礎(chǔ)設(shè)施施工是近年來隨著國外交通設(shè)施的高速發(fā)展而逐步發(fā)展起來的,深水樁具備施工難度高,危險(xiǎn)性大等特點(diǎn),所以近年來一直被人們所重視,施工中只能按照深水樁施工的工藝要求進(jìn)行施工,才能取得良好質(zhì)量的工程。
http:///
一、橋梁深水基礎(chǔ)施工關(guān)鍵技術(shù)
1、鉆孔
在鉆孔施工前在鉆孔平臺(tái)的順橋向布置機(jī)具墊梁和鉆機(jī)走道,并進(jìn)行試鉆,同時(shí)取得鉆進(jìn)的各施工參數(shù)。在施工場(chǎng)所適當(dāng)位置設(shè)置泥漿池,最好選用優(yōu)質(zhì)膨潤(rùn)土進(jìn)行造漿,在造漿前應(yīng)提前試驗(yàn)并記錄泥漿性能指標(biāo),以便施工中參考。在剛開孔時(shí),鉆機(jī)應(yīng)輕壓慢轉(zhuǎn),在正常鉆進(jìn)時(shí)要密切注意泥漿指標(biāo)和鉆進(jìn)速度,根據(jù)泥漿指標(biāo)來保證用制備的泥漿能夠?qū)€@進(jìn)中形成的劣質(zhì)泥漿置換出來。鉆孔過程中如果發(fā)現(xiàn)偏斜現(xiàn)象應(yīng)及時(shí)采取措施給予糾正。最終成樁質(zhì)量控制如表1。
表1 成孔質(zhì)量允許偏差
2、撈渣及清孔
鉆孔結(jié)束后將鉆頭提至孔外,然后采用氣舉反循環(huán)鉆對(duì)孔內(nèi)進(jìn)行清碴,其工作方法是將高壓風(fēng)通至導(dǎo)管內(nèi),在導(dǎo)管上部形成氣水混合物負(fù)壓區(qū),由于上部負(fù)壓導(dǎo)致孔低泥漿及石渣沿著導(dǎo)管隨負(fù)壓區(qū)上升,最終排出孔外,排出孔外的泥漿經(jīng)泥漿分離器進(jìn)行分離后,純泥漿回流到孔內(nèi),因該方法施工原理是從孔底